Date: 2015-02-01 23:17 GMT-05:00
Subject: Bridge Request 24M and 19M
Dear LIỂU DUYÊN! I visited areas that requested bridge construction and found 2 areas that really need of help.
Bridge #1 in village 8 in the commune of Nguyễn Phích – district U Minh, connect to village 10 in commune Thới Bình – the length for the bridge is 24m. Both side have many students – village 10 in commune of Thới Bình have to cross the river to go to school in Nguyễn Phích. There are over 100 families on both side of the river in this area. Bridge #2 in village Bình Minh 2 in commune of Khánh Hưng – district Trần Văn Thời, the bridge will connect to 2 main rivers and there are many residents in the area. Local officials and residents of the area requested bridge construction a long time ago but have not receive help, the residents were very happy when I came to survey the area today.
Liêu Duyên, I believe these 2 bridges are in need of our help and 10 water well commune Nguyễn Phích – district U Minh (also surveyed today).
Summary:
1/ Bridge for commune Nguyễn Phích district U Minh … length 24m width 1m6 (Liên Hoa = Lotus)
2/ Bridge for commune Khánh Hưng district Trần Văn Thời … length 19m width 1m6 (Tuệ Chiếu = Wisdom Shine)
3/ Water Well for commune Nguyễn Phích district U Minh … 10 wells
LD, let me know from our sponsors so I can start the paperwork. Many thanks LD.
sis Tuyet
This post is also available in: Vietnamese